Project Overview
Designed for warehouse storage, office space, and shipping functions in a single, efficient structure.
- Fast-Track Construction – Completed in just over 6 months, with multiple trades working in tandem to meet strict deadlines.
- High-Capacity Storage – Equipped with 5 racking bays capable of storing up to 7,830 pallets of product in a temperature-controlled environment.
- Efficient Operational Flow – Purpose-built layout allows for streamlined product movement and traffic flow throughout the facility.
- Proven Performance Under Pressure – Demonstrates GJC’s ability to deliver complex industrial projects on compressed timelines without compromising quality.
- 57,000 sq. ft.
- Burley, ID
- 6.5 months build time
- Completed in 2024
Project Overview
Purpose-built for high-capacity extrusion manufacturing, integrated office and lab operations, and efficient rail-served material handling.
- Building Scope:
- Pre-engineered metal building with 52,000 sq ft of clear-span production floor, designed to support five extrusion lines with utility rough-ins and layout for a future sixth line.
- Includes 11,750 sq ft of finished office space built out for operations staff, production support, and on-site lab testing capabilities.
- Site Development & Infrastructure:
- Rail spur installed to service the facility directly, wrapping the rear laydown yard and shipping area for secure, efficient material handling.
- Full development of the 17-acre site, including grading, paving, drainage, and utilities, to deliver a safe and functional work environment with room for future expansion.
- 63,750 sq. ft.
- Rupert, ID
- 9 months build time
- Completed in 2025